Industry news

Use and precautions of heat conductive adhesive

Use process

1. Clean the surface: use ethanol or acetone to clean the surface of the stuck or coated material to remove rust, dust and oil stains.

2. Sizing: unscrew the rubber tube cap, evenly spread the glue on the cleaned surface, immediately stick another substrate to be glued, and apply a certain pressure to fix it.

3. Curing: The bonded or sealed parts shall be naturally cured at room temperature. The curing process is a process from the surface to the interior. The temperature is 23 ± 2 ℃, the relative humidity is 50% ± 5%, the curing depth can reach 3mm after 24 hours, the maximum curing depth can reach 6mm, and the full curing can be achieved after 7 days.

4. Before further treatment or packaging of parts to be bonded, it is recommended to wait for a sufficient time so that the fastness and integrity of bonding will not be affected.

matters needing attention

1. After the operation is completed, for the unused products, the solidified gel at the sealing port shall be removed immediately and the pipe cover shall be tightened to prevent the remaining gel from curing in the pipe and affecting the next normal use.

2. When it is used again, if there is a little crust at the seal, it can be removed without affecting the normal use.

3. During storage, a small amount of curing may occur at the nozzle, which can be used normally without affecting the product performance.